Access 34,911 building permits issued in Sugar Land, Texas through a single REST API. Refreshed daily from the official Sugar Land open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Sugar Land.
The 10 most recent permits issued in Sugar Land, Texas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-09-04 | BLDR-2026-01413 | 1727 GLADDEN | Foundation | WE WILL BE DOING FOUNDATION REPAIR USING SOLID 6X12 SOLID CYLINDERS PRESSED 6500P... |
| 2026-09-04 | BLDR-2026-01404 | 1518 YEGUA RIVER | Interior remodel | WORKING WITH JAMES POSSEY AND ADAM BARTLING, APPLYING FOR A RESIDENTIAL KITCHEN RE... |
| 2026-09-04 | BLDR-2026-01410 | 15311 TRUSLOW POINT | Foundation | INSTALLING 16 EXTERIOR PILINGS. |
| 2026-09-04 | BLDR-2026-01407 | 2215 MEADOW BRIAR | Foundation | INSTALL 16 STEEL PUSH PIERS AROUND FOUNDATION PERIMETER TO STABILIZE/REPAIR |
| 2026-09-04 | BLDR-2026-01406 | 234 DARBY TRAILS | Roofing | ROOF REPLACEMENT |
| 2026-09-04 | BLDR-2026-01411 | 3210 EXPLORER COVE | Foundation | INSTALLING 10 INTERIOR PILINGS. |
| 2026-09-04 | BLDR-2026-01405 | 3414 VIRGIN ISLAND | Roofing | REMOVE EXISTING AND INSTALL NEW TAMKO TITAN XT CLASS III ROOF |
| 2026-09-04 | BLDR-2026-01408 | 2903 PASTURE | Foundation | INSTALLING 15 EXTERIOR AND 5 INTERIOR PILINGS. |
| 2026-09-04 | BLDR-2026-01412 | 9107 MORNINGSTAR | Roofing | REMOVE EXISTING ROOF SYSTEM DOWN TO DECKING, INSTALLE NEW SHINGLE ROOF SYSTEM |
| 2026-09-04 | ELEC-2026-01200 | 1317 LAKE POINTE | Electrical | ILLUMINATED WALL SIGN. SIGN C |
Query Sugar Land, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Sugar Land permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Sugar%20Land&state=TX&issued_after=2026-04-01"
Related coverage in Texas and nationwide.
We ingest data directly from the official Sugar Land open data portal (CKAN Open Data) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Sugar Land, Texas was issued on September 4, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Sugar Land permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
Most Sugar Land permits are issued on the same day they are filed, reflecting electronic submission and same-day processing for routine permit types. Larger or more complex projects (new construction, major additions) often take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key