Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Texas

Waco, Texas Building Permit Search

PermitStack indexes 108,888 building permits issued in Waco, Texas, with 13,713 issued in the last 12 months alone. Search by address, contractor, category, and date via our free REST API.

108,888
Total permits
13,713
Last 12 months
1,177
Last 30 days
+10%
vs same period prior year
Oct 5, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
2,303
Electrical
2,008
Roofing
982
New construction
976
Interior remodel
858
Mechanical
672
HVAC
644
Renovation
417
Signage
221
Demolition
198

Permit data by trade in Waco

Drill into the most common permit categories in Waco.

Permits by ZIP code in Waco

Permit activity for individual ZIP codes in Waco, newest first by volume.

Property history for Waco

Every permit we hold for one Waco address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Waco, Texas. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-0526-01817-ELEC3912 LUNAR STElectrical110-15, 220-7, 0-400 amps-1, slab RI, tfinal and tpole
2026-10-0526-02046-PLUM4004 LUNAR STPlumbing**2wc, 3lavs, 2t, 1shwr, 1ks, 1dw, 1disp, 1wh, 1wm, water/sewer** New Construction...
2026-10-0526-01818-ELEC10101 GRACE DRElectrical110-15, 220-7, 0-400 amps-1, slab RI, tfinal and tpole
2026-10-0526-01820-ELEC3612 APOLLO STElectrical110-15, 220-7, 0-400 amps-1, slab RI, Tfinal and tpole
2026-10-0526-01249-ROW10324 ALTAIR DROtherINSPECTOR - Keith Mullins: 254-709-2565 **ResNC** Flatwork
2026-10-0526-01821-ELEC3900 LUNAR STElectrical110-15, 220-7, 0-400 amps-1, slab RI, tfinal and tpole
2026-10-0526-01812-ELEC11812 CERES STElectrical110-15, 220-7, 0-400 amps-1, slab RI, Tfinal and tpole
2026-10-0526-02045-PLUM3912 LUNAR STPlumbing***2-wc, 3-lav, 2-tub, 1-shower,1-ks, 1-dw, 1-disp, 1-wh, 1-wm, 1-water/sewer***Ne...
2026-10-0526-01813-ELEC11808 CERES STElectrical110-15, 220-7, 0-400 amps-1, slab RI, tfinal and tpole
2026-10-0526-01816-ELEC4004 LUNAR STElectrical110-15, 220-7, 0-400 amps-1, slab RI, tfinal and tpole

Access Waco permit data via API

Query Waco, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Waco permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Waco&state=TX&issued_after=2026-09-06"

Sources for Waco

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal108,8882026-10-05

Other cities we cover

Related coverage in Texas and nationwide.

FAQ

Where does PermitStack get Waco permit data?

We ingest Waco's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Waco data?

The newest permit we hold for Waco, Texas is dated October 5, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Waco permits without an API key?

Yes — search Waco permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Waco permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Waco building permit take to issue?

The median time from permit filing to issuance in Waco, Texas is 4 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Waco permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key