Access 75,443 building permits issued in Bothell, Washington through a single REST API. Refreshed daily from the official Bothell open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Bothell.
The 10 most recent permits issued in Bothell, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-08 | FNR2026-43165 | 21717 30TH | Addition | E26-24149, OTC, Pfizer Bldg 3, Suite N189, This is a modification or addition to a... |
| 2026-06-08 | FNR2026-43147 | 21135 BOTHELL-EVERETT | Interior remodel | E26-23902, Alteration of nozzle drops to accommodate new appliance lineup. |
| 2026-06-08 | ROW2026-43167 | 8930 186TH | Other | E26-24251, Project 6026195 - Ziply RDMV. Access existing poles 1 and 2 on NE 186th... |
| 2026-06-08 | FNR2026-43163 | 21823 30TH | Addition | E26-24147, OTC, Pfizer Bldg 1, Suite N238, This is a modification or addition to a... |
| 2026-06-08 | EPSF2026-43169 | 2427 238TH | Plumbing | E26-24283, Replacement of 1 Shower, Tub or Combo |
| 2026-06-08 | PMF2026-43168 | 3918 243RD | Plumbing | E26-24248, OTC, Unit F302, Water Heater Electric - Less than 60 gallons: 1, Work d... |
| 2026-06-08 | BNR2026-43164 | 1631 220TH | Other | E26-24181 Cepheid Stormwater Treatment Installation of detached nonresidential acc... |
| 2026-06-08 | BSF2026-43166 | 8816 200TH | Interior remodel | E26-24189 Kumar Residence Alteration Cutting out a wall in dining room and install... |
| 2026-06-08 | EMSF2026-43159 | 10013 153RD | Plumbing | E26-24105, Replace 1 Gas Water Heater. |
| 2026-06-08 | MNR2026-43172 | 18003 120TH | New construction | E26-24346, TriStar Retail, Ground up stand alone retail 2,156 SF building on undev... |
Query Bothell, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Bothell permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Bothell&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Bothell open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Bothell, Washington was issued on June 8, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Bothell permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Bothell, Washington is 10 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key