Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Washington

Camas, Washington Building Permit Search

This page is not current. The newest Camas permit we hold is dated August 7, 2026. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 14,312 building permits on record in Camas, Washington through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

14,312
Total permits
1,182
Last 12 months
0
Last 30 days
-
Vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

New construction
247
HVAC
202
Plumbing
195
Fire alarm
109
Interior remodel
74
Mechanical
72
Roofing
42
Renovation
40
Addition
29
Demolition
20

Permit data by trade in Camas

Drill into the most common permit categories in Camas.

Top contractors in Camas

The most active contractors by permit volume in Camas, with a profile of each one's permit history. Counts are permits we hold for Camas.

Permits by ZIP code in Camas

Permit activity for individual ZIP codes in Camas, newest first by volume.

Property history for Camas

Search held permit records for a Camas address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Camas, Washington, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-08-07PLMR-26-1436355 NE 44TH CIRPlumbingWater service replacement from meter to home
2026-08-07 (filed)BLDR-26-21344749 NW 71ST AVENew constructionNew SFR - THE NINES AT CAMAS MEADOWS LOT 44
2026-08-07 (filed)BLDR-26-213523523 NE WEAKLEY RDNew constructionNew Construction, single family home. Replacement Home.
2026-08-07PLMR-26-14374531 NW FREMONT STPlumbingreplacing tub unit and valve
2026-08-06 (filed)FEXS-26-17071602 NW HAZEL CTFire alarmNew 13d system
2026-08-06 (filed)BLDC-26-11591615 NW 6TH AVERoofingVOID - See Internal Notes
2026-08-06 (filed)FEXS-26-17105171 N 94TH AVENew constructionNew Construction
2026-08-06 (filed)FEXS-26-17085231 N 94TH AVENew constructionNew Construction
2026-08-06 (filed)FEXS-26-17045796 N 94TH AVENew constructionNew Construction
2026-08-06 (filed)FEXS-26-17035838 N 94TH AVENew constructionNew Construction

Access Camas permit data via API

Query a page of held Camas, Washington permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Camas permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Camas&state=WA&date_after=2026-10-22"

Sources for Camas

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal14,3122026-08-07Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Camas permit data?

We ingest Camas's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Camas data?

The newest permit we hold for Camas, Washington is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Camas permits without an API key?

You need a free account, which needs no credit card. With it you can search Camas permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Camas permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Camas building permit take to issue?

The median time from permit filing to issuance in Camas, Washington is 1 day, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Camas permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key