Access 14,453 building permits issued in Camas, Washington through a single REST API. Refreshed daily from the official Camas open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Camas.
The 10 most recent permits issued in Camas, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-20 | PLMR-26-1407 | — | Plumbing | Run gas line from meter to rear deck for BBQ |
| 2026-06-19 | MECR-26-1695 | 3024 31ST | HVAC | Install Gas Furnace & Air Conditioner |
| 2026-06-19 | MECR-26-1696 | 1215 COUCH | Mechanical | REPLACING ALL HEATERS WITH NEW 3X1 DUCTLESS SYSTEM |
| 2026-06-18 | FEXS-26-1669 | 5202 93RD | New construction | NFPA 13D new construction Sekisui Hot Homes Shawood |
| 2026-06-18 | GENCR-2026-1206 | 528 4TH | Other | Clark PUD needs to string new overhead wire across NE 3rd Ave to deliver temporary... |
| 2026-06-18 | FEXS-26-1677 | 538 GARDEN | Fire alarm | Installation of New NFPA 13D Residential Fire Sprinkler System |
| 2026-06-18 | FEXS-26-1671 | 5187 93RD | New construction | NFPA 13D new construction Sekisui Hot Homes Green Mountain |
| 2026-06-18 | FEXS-26-1670 | 5205 93RD | New construction | NFPA 13D new construction Sekisui Hot Homes Green Mountain |
| 2026-06-18 | PLMR-26-1406 | 1918 283RD | Plumbing | I'm plumbing a bathroom in my new detached garage. It will tie into the exist... |
| 2026-06-18 | FEXS-26-1667 | 5404 93RD | New construction | NFPA 13D new construction Sekisui Hot Homes Green Mountain |
Query Camas, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Camas permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Camas&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Camas open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Camas, Washington was issued on June 20, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Camas permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Camas, Washington is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key