Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Washington

Gig Harbor, Washington Building Permit Search

Access 7,408 building permits issued in Gig Harbor, Washington through a single REST API, normalized into a consistent schema. Data through October 21, 2026.

7,408
Total permits
594
Last 12 months
59
Last 30 days
+37%
vs same period prior year
Oct 21, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Mechanical
145
Plumbing
129
Renovation
41
New construction
40
Roofing
32
HVAC
30
Signage
27
Fire alarm
24
Interior remodel
23
Addition
7

Permit data by trade in Gig Harbor

Drill into the most common permit categories in Gig Harbor.

Top contractors in Gig Harbor

The most active contractors by permit volume in Gig Harbor, with a profile of each one's permit history. Counts are permits we hold for Gig Harbor.

Permits by ZIP code in Gig Harbor

Permit activity for individual ZIP codes in Gig Harbor, newest first by volume.

Property history for Gig Harbor

Every permit we hold for one Gig Harbor address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Gig Harbor, Washington. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-10-21MP-26-01758809 NORTH HARBORVIEWOtherMP-COM 8809 - RELOCATION OF THE GAS METERS
2026-10-21MP-26-01747400 STINSON AVE UNIT 235HVACMP-RESONLINE ERICKSON - DUCTLESS HEAT PUMP
2026-10-19BD-26-01585709 34TH AVEInterior remodelBD-COM-REMODEL 5709 37TH AVE - INTERIOR REMODEL
2026-10-19BD-26-01579013 PRENTICE AVEInterior remodelBD-RES-GARAGE LONG - REMODEL EXISTING DETACHED GARAGE
2026-10-16MP-26-01736711 KIMBALL DROtherMP-COM GIG HARBOR FIRE & MEDIC ONE - STATION 51 - GENERATOR
2026-10-16PP-26-01243202 HARBORVIEW DR SUITEPlumbingPP-COM GIG HARBOR WINE CO. - PLUMBING
2026-10-16FC-26-00146711 KIMBALL DROtherFC-OPS GIG HARBOR FIRE & MEDIC ONE - STATION 51
2026-10-15FC-26-00133313 HARBORVIEW DROtherFC-OPS NETSHED NO 9 - OUTDOOR DINING TENT - TEMPORARY
2026-10-15PP-26-01236802 CASCADE AVEPlumbingPP-RESONLINE GREEN - REPLACE GAS WATER HEATER SE-26-0036 Chum Festival 2026 (11-21...
2026-10-15MP-26-01726802 CASCADE AVEOtherMP-RESONLINE Green - WH

Access Gig Harbor permit data via API

Query Gig Harbor, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Gig Harbor permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Gig%20Harbor&state=WA&issued_after=2026-09-23"

Sources for Gig Harbor

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
Permitspublic records request7,4082026-10-21

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Gig Harbor permit data?

We ingest Gig Harbor's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Gig Harbor data?

The newest permit we hold for Gig Harbor, Washington is dated October 21, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Gig Harbor permits without an API key?

Yes — search Gig Harbor permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Gig Harbor permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Gig Harbor building permit take to issue?

The median time from permit filing to issuance in Gig Harbor, Washington is 14 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Gig Harbor permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key