Access 302 building permits issued in Orting, Washington through a single REST API. Refreshed daily from the official Orting open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Orting, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-26 | US-WA52005-B-2026-132 | 307 RIVER AVE SE | Other | Street Opening (Right-of-Way) Temporary Obstruction |
| 2026-06-26 | US-WA52005-B-2026-65 | 533 HARMAN WAY S | Other | Temporary uses Other Temporary Placement Firework Stand |
| 2026-06-25 | US-WA52005-B-2026-127 | 406 PARKER LN | Mechanical | Mechanical New Heating |
| 2026-06-25 | US-WA52005-B-2026-146 | 1011 RIDDELL AVE NE | HVAC | Mechanical Repair Furnace |
| 2026-06-25 | US-WA52005-B-2025-323 | 303 MEADOW LN SE | Other | Residential building New Single-family dwelling |
| 2026-06-24 | US-WA52005-B-2026-118 | 709 TEETOR CIRCLE NW, LOT 25 | Other | Residential building New Single-family dwelling |
| 2026-06-23 | US-WA52005-B-2026-148 | 501 WILLIAMS BLVD NW | Plumbing | Mechanical New Gas Line |
| 2026-06-23 | US-WA52005-B-2026-150 | 1215 RIDDELL AVE NE | Mechanical | Mechanical Repair A/C |
| 2026-06-23 | US-WA52005-B-2026-119 | 713 TEETOR CIRCLE NW, LOT 23 | Other | Residential building New Single-family dwelling |
| 2026-06-22 | US-WA52005-B-2026-145 | 1407 HARDTKE AVE NE | Solar | Solar Panel New Roof Mount |
Query Orting, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Orting permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Orting&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Orting open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Orting, Washington was issued on June 26, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Orting permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Orting, Washington is 14 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key