Access 356 building permits issued in Orting, Washington through a single REST API, normalized into a consistent schema. Data through October 2, 2026.
Most common permit types issued in the last year.
Permit activity for individual ZIP codes in Orting, newest first by volume.
Every permit we hold for one Orting address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent permits issued in Orting, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-10-02 | US-WA52005-B-2026-231 | 803 CALISTOGA CT SW | Other | Street Opening (Right-of-Way) Temporary Obstruction |
| 2026-09-30 | US-WA52005-B-2026-232 | 314 HARMAN WAY S | Roofing | Residential building Re-roof Single-family dwelling |
| 2026-09-25 | US-WA52005-B-2026-227 | 214 GIPPLE ST NE | HVAC | Mechanical Remodel Furnace |
| 2026-09-24 | US-WA52005-B-2026-223 | 302 KANSAS ST SW | Other | Street Opening (Right-of-Way) Temporary Obstruction |
| 2026-09-23 | US-WA52005-B-2026-191 | 407 FISCHER ST SE | New construction | Residential building New Single-family dwelling |
| 2026-09-23 | US-WA52005-B-2026-204 | 403 FISCHER ST SE | New construction | Residential building New Single-family dwelling |
| 2026-09-22 | US-WA52005-B-2026-205 | 418 MULLER CT SE | New construction | Residential building New Single-family dwelling |
| 2026-09-22 | US-WA52005-B-2026-192 | 410 FISCHER ST SE | New construction | Residential building New Single-family dwelling |
| 2026-09-22 | US-WA52005-B-2026-190 | 417 MULLER CT SE | New construction | Residential building New Single-family dwelling |
| 2026-09-15 | US-WA52005-B-2026-222 | 407 HAYS AVE SW | HVAC | Mechanical Repair Furnace |
Query Orting, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search Orting permits issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Orting&state=WA&issued_after=2026-09-06"
The official record sets behind this page, with the date each one's data runs through.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | Cloudpermit | 356 | 2026-10-02 |
Related coverage in Washington and nationwide.
We ingest Orting's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Orting, Washington is dated October 2, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.
Yes — search Orting permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.
The median time from permit filing to issuance in Orting, Washington is 12 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key