Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Washington

Sequim, Washington Building Permit Search

This page is not current. The newest Sequim permit we hold is dated August 7, 2026. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. The page stays up for reference and returns to search results when the data is current again.

Access 807 building permits on record in Sequim, Washington through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

807
Total permits
306
Last 12 months
0
Last 30 days
-
Vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

HVAC
67
New construction
65
Roofing
33
Interior remodel
28
Plumbing
16
Mechanical
15
Fire alarm
12
Demolition
8
Signage
7
Solar
2

Permits by ZIP code in Sequim

Permit activity for individual ZIP codes in Sequim, newest first by volume.

Property history for Sequim

Search held permit records for a Sequim address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Sequim, Washington, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-08-07 (filed)MECH-26-0070952 E Spruce StHVACInstall Trane Series XV18 R454B Heat Pump System 2TON
2026-08-07 (filed)SOLAR-26-0002 - SolarInstallation of a 7.92kW grid-tied solar electric system with 18 Silfab Solar SIL-...
2026-08-07MECH-26-006931 Opal LnMechanicalNew propane line for gas stove.
2026-08-07 (filed)MECH-26-0071501 West Summer Breeze LaneMechanicalMitsubishi ducted full system
2026-08-06MECH-26-006881 Jara WayHVACInstall heat pump and air handler.
2026-08-06 (filed)CBP-26-0027651 W WASHINGTON StreetInterior remodelAdding a flagpole in front of building.
2026-08-06MECH-26-0067411 N Ryser AveHVACInstall heat pump and air handler.
2026-08-05ROOF-26-0030890 N PORTSIDE WayRoofingremover and replace roofing with malarkey vista 40nyear roofing
2026-08-05 (filed)RBP-26-0108325 N 5th Ave , Unit 34Interior remodelAdding garage door to the front of the carport. The side and rear of the carport a...
2026-08-05ROOF-26-0031367 W BELL StreetRoofingRe-roof

Access Sequim permit data via API

Query a page of held Sequim, Washington permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Sequim permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Sequim&state=WA&date_after=2026-10-22"

Sources for Sequim

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal8072026-08-07Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in Washington and nationwide.

FAQ

Where does PermitStack get Sequim permit data?

We ingest Sequim's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Sequim data?

The newest permit we hold for Sequim, Washington is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Sequim permits without an API key?

You need a free account, which needs no credit card. With it you can search Sequim permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Sequim permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Sequim building permit take to issue?

The median time from permit filing to issuance in Sequim, Washington is 2 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Sequim permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key