Access 1,876 building permits issued in Shelton, Washington through a single REST API. Refreshed daily from the official Shelton open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Shelton.
Most active contractors by permit volume in Shelton.
The 10 most recent permits issued in Shelton, Washington. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-06 | UTIL-2376-2026 | — | Addition | 4 Inch CIPP Liner (upto 50ft) - ADD ON - Does not include digging or additional wo... |
| 2026-08-05 | BLDR-2374-2026 | 1544 FAIRMOUNT | Interior remodel | Restore fire damaged portion of home. |
| 2026-08-04 | UTIL-2373-2026 | — | Plumbing | Water main and fire lines to connect to City of Shelton's water system to hote... |
| 2026-07-31 | MECC-2372-2026 | 301 WALLACE KNEELAND | Interior remodel | Replace Gas Package Unit for H&R Block (EMERGENCY OFFICE IS OCCUPIED). |
| 2026-07-31 | BLDR-2371-2026 | — | Roofing | Removing existing roofing and installing 50-year shingles/ADDRESS IS NOT IN THE CI... |
| 2026-07-30 | BLDC-2369-2026 | 2325 Madison Street | New construction | Construct new storage building |
| 2026-07-30 | BLDR-2370-2026 | 1427 SUMMIT | Demolition | removal - elevated garden, construction wood/beams |
| 2026-07-30 | BLDR-2368-2026 | — | Roofing | Architectural composite shingle roofing application |
| 2026-07-29 | BLDR-2365-2026 | 703 15TH | Roofing | Tear off and re-roof composite roofing |
| 2026-07-29 | BLDC-2367-2026 | 112 COTA | Roofing | Tear off and install 60 mil TPO membrane |
Query Shelton, Washington permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Shelton permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Shelton&state=WA&issued_after=2026-04-01"
Related coverage in Washington and nationwide.
We ingest data directly from the official Shelton open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Shelton, Washington was issued on August 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Shelton permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Shelton, Washington is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key