Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise export contactAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Building inspections

Building Inspection Records API: Coverage, Dates and Results

A building inspection records API returns municipal inspection-log entries associated with permitted work. PermitStack supports searches by property, place, permit, date, result and trade, plus a permit-linked history route. Read the date basis and source coverage with every result: a scheduled visit or administrative event is different from a performed inspection, and coverage varies by location.

What kind of inspection record is this?

This dataset concerns municipal records for permitted building work. It does not supply a private buyer's home-inspection report or a lender's draw-inspection report. A source may publish the trade, inspection type, result and dates while omitting detail another source includes.

The Los Angeles building and safety inspection dataset is an example of an official municipal inspection feed. Cross-source integration still needs a common schema and an explanation of which entries represent performed work.

Measured inspection coverage

On 27 October 2026, PermitStack's maintained inspection counters reported 20,596,598 log records from 15 served sources. Of those records, 13,401,922 had a normalized PASS, FAIL or PARTIAL result, and 16,172,683 were linked to a permit in PermitStack. These totals include historical and frozen sources.

The log count excludes permit-summary rows. It still includes scheduled, cancelled and administrative-event entries, so it must not be described as a count of completed inspections. Reinspections can produce multiple records for the same project.

Examples from the source counters, checked 27 October 2026
SourceLog recordsMeasured data through
Los Angeles, California10,674,1532026-10-17
College Station, Texas515,1632026-10-21
Summit County, Colorado, frozen snapshot435,4722026-09-24

Permit coverage elsewhere does not imply inspection coverage there. Use the inspection coverage endpoint for the locations you need. Its record counts, data_through, data_status, snapshot_as_of and source notes help you judge whether the records fit your workflow.

Check coverage and request inspection records

Set your API key before running these examples. Coverage is available to any API key. The search requires inspection access. The example date window is illustrative and queries the measured Los Angeles source; it is not a promise of continuous or complete daily coverage.

set -o pipefail
: "${PERMITSTACK_API_KEY:?Set your API key}"
curl --fail-with-body --silent --show-error --get \
  'https://api.permit-stack.com/v1/inspections/coverage' \
  -H "X-API-Key: $PERMITSTACK_API_KEY" \
  --data-urlencode 'state=CA'

curl --fail-with-body --silent --show-error --get \
  'https://api.permit-stack.com/v1/inspections/search' \
  -H "X-API-Key: $PERMITSTACK_API_KEY" \
  --data-urlencode 'city=Los Angeles' \
  --data-urlencode 'state=CA' \
  --data-urlencode 'date_after=2026-10-01' \
  --data-urlencode 'date_before=2026-10-17' \
  --data-urlencode 'summaries=exclude' \
  --data-urlencode 'per_page=25' \
  | jq '{total, total_capped, total_unknown, sources,
         results: [.results[] | {id, permit_id, inspection_type,
           trade, result, inspection_date, inspection_date_basis,
           date_inspected, is_final, origin}]}'

Separate a performed date from a scheduled date

inspection_date is the date used for the search window. Its meaning is carried by inspection_date_basis: inspected, event, scheduled, requested or none. An administrative entry such as a permit being finalized can have an event date without documenting a performed inspection.

When you need performed inspections, inspect date_inspected and require inspection_date_basis=inspected in your application after retrieval. There is no search parameter named inspection_date_basis. Preserve the source's result_raw and inspection_type_raw when reviewing how the normalized result was obtained.

Use result=PASS or inspection_type=FINAL when those filters match your question. A passing final inspection for a trade does not establish that every other trade has passed or that a certificate of occupancy was issued.

Link a record to the right permit

When a record carries permit_id, that is the explicit link to a permit held by PermitStack. For a known permit ID, request GET /v1/permits/{permit_id}/inspections. For a source permit number, use inspection search with permit_number and a place or jurisdiction_id to avoid confusing identical numbers from different authorities.

A null permit link means the inspection record was not linked to a held permit. An empty permit-linked history can therefore coexist with inspection records found by number or address. Check the source and property before making a fallback match.

Use inspection evidence in a broader workflow

Contractors can review recorded inspection outcomes. Insurers can compare work records with reported improvements. Lenders can add municipal milestones to a review queue. None of these uses turns public inspection data into a full site assessment.

Inspection access is an add-on for Developer and Business and is included in Scale. See dataset access and pricing and the API dataset reference. For occupancy evidence, use the separate certificate of occupancy lookup guide. The permit dataset directory covers a different record population.

Frequently asked questions

Does every inspection-log row represent a completed inspection?

No. A log can include scheduled visits, cancellations and administrative events. Read inspection_date_basis and date_inspected, and keep the normalized result separate from the date.

Does PermitStack have inspections everywhere it has permits?

No. The inspection dataset has its own source coverage and freshness. Check /v1/inspections/coverage for the locations you need.

What happens when an inspection is not linked to a permit?

Its permit_id can be null. You may still find the record through inspection search by source permit number or location. Validate the property and issuing authority before creating your own match.

Is this the same as a private home inspection report?

No. These are municipal inspection records for permitted work. They do not replace a private property assessment, a lender's draw inspection or an issued occupancy certificate.

Counts describe the stated population in the maintained database counters or bounded sample checked on 27 October 2026. Source dates, geographic coverage and field availability vary. See the data methodology and API reference.

Explore the API dataset reference

Check the locations, fields and access your workflow needs before choosing a plan.

Explore the API dataset reference