Permit Data for Construction Lending: Track Public Milestones

Permit data can support construction-loan monitoring by adding public records of permitting, municipal inspections and occupancy certificates to a project review. Match the project carefully, preserve each record's date and source, and use changes to prompt follow-up. Public milestones supplement the lender's documents and inspections; they do not establish completion percentage or authorize a draw.

Give each milestone its own meaning

A project timeline can contain an issued building permit, a passed electrical inspection and a temporary occupancy certificate. Those are useful facts, but they describe different scopes. Treating every one as “project complete” loses the distinctions a reviewer needs.

Public records and the questions they can support
RecordReview questionDo not infer
PermitDoes the reported work align with the documented project?That an issued permit proves work has started.
Municipal inspectionWhat inspection outcome was recorded for this scope?A cost-to-complete estimate or draw approval.
Occupancy certificateWhat kind of certificate was issued, and for which property or space?That every certificate is final, current or for the entire development.
Contractor licenseWhat credential and status appear in the board roster?Current workmanship, financial capacity or performance.

The OCC's Commercial Real Estate Lending handbook addresses the broader lending-risk context. This guide covers a data-integration workflow; it does not define a lender's disbursement policy.

Check inspection coverage before designing the workflow

In the source counters checked on 27 October 2026, College Station, Texas held 515,163 inspection-log records, of which 478,762 carried a performed inspection date. The source's measured data-through date was 2026-10-21. These are source-wide historical counts, not observations about any individual financed project.

Even within that source, a logged entry is not automatically a completed visit. Other locations can have no inspection feed, an older snapshot or no usable permit link. Check the inspection dataset's coverage and date rules independently from the permit dataset.

Resolve a known permit, then fetch its inspections

Use a permit number from your project file, not a guessed example. Set the project city and state as well, because a permit number is not globally unique. Review the search result before selecting its PermitStack ID.

set -o pipefail
: "${PERMITSTACK_API_KEY:?Set your API key}"
: "${PROJECT_PERMIT_NUMBER:?Set the source permit number}"
: "${PROJECT_CITY:?Set the project city}"
: "${PROJECT_STATE:?Set the two-letter state}"
curl --fail-with-body --silent --show-error --get \
  'https://api.permit-stack.com/v1/permits/search' \
  -H "X-API-Key: $PERMITSTACK_API_KEY" \
  --data-urlencode "permit_number=$PROJECT_PERMIT_NUMBER" \
  --data-urlencode "city=$PROJECT_CITY" \
  --data-urlencode "state=$PROJECT_STATE" \
  --data-urlencode 'per_page=25' \
  | jq '{total, total_unknown, total_capped, coverage,
         results: [.results[] | {id, permit_number, status,
           address_street, address_city, address_state,
           date_filed, date_issued, date_completed}]}'

# Select the matching ID after reviewing the location and scope.
: "${PERMIT_ID:?Set the reviewed PermitStack permit ID}"
curl --fail-with-body --silent --show-error --get \
  "https://api.permit-stack.com/v1/permits/$PERMIT_ID/inspections" \
  -H "X-API-Key: $PERMITSTACK_API_KEY" \
  --data-urlencode 'summaries=exclude' \
  --data-urlencode 'per_page=25' \
  | jq '{permit_id, total, total_unknown, total_capped, sources,
         results: [.results[] | {id, inspection_type, trade,
           result, inspection_date_basis, date_inspected, is_final}]}'

The second request requires inspection access. If the linked history is empty, inspect coverage and consider a separately reviewed search by source permit number and jurisdiction. Do not automatically attach every record sharing an address or a similar permit number.

Retain the evidence behind each project event

Store the PermitStack record ID, the source permit number, the issuing place, the normalized status and the relevant dates. For an inspection, also retain the trade, raw result where available, date basis and source data-through date. These fields let a reviewer distinguish a new event from a newly ingested historical record.

When you need occupancy evidence, query GET /v1/certificates/search with permit_number and a location, or use an explicit linked_permit_id returned on a certificate record. Read its type and status. A temporary certificate, a revision and a final certificate should remain distinct timeline events.

The CO lookup guide explains renewals and completion records. For a contractor review, use the licensing dataset as a separate evidence stream.

Use gaps and changes to ask better questions

A missing recent inspection might reflect no new inspection, a publication delay, a source-access problem or an unmatched record. Compare the source's currency before treating the gap as a project delay. A failed inspection can prompt a request for the subsequent resolution, but the public record alone may not tell you whether that resolution has already occurred.

A useful review queue can distinguish “new evidence,” “source behind,” “unmatched record” and “needs project-document review.” It should not assign a completion percentage from the number of passed inspections. Different projects and trades require different inspection sequences.

Choose access for the actual evidence you use

Permit history, inspection records, certificates and licensing have different access rules. Inspections are an add-on for Developer and Business and are included in Scale. Certificates and basic licensing are add-ons for Developer and included in Business and Scale. See current access details and the dataset API reference.

The lending solution page describes the broader use case. Start with a known project in a supported jurisdiction and compare the retrieved records with the documents already in your workflow.

Frequently asked questions

Can public inspection data replace a lender's draw inspection?

No. Municipal inspections document permitted-work events. They do not establish the lender's required completion percentage, budget position or authority to disburse funds.

Does no recent inspection record prove a construction delay?

No. Check source currency, publishing gaps and record matching first. A missing API record is not evidence by itself that no inspection occurred.

How do I connect a permit to inspection records?

Use a reviewed PermitStack permit ID with /v1/permits/{permit_id}/inspections. If no linked records are found, inspect coverage and review a separate search by source permit number and jurisdiction.

Does a final inspection prove that an occupancy certificate exists?

No. Query the certificate dataset separately and inspect certificate type, status, dates and the property or space it describes.

Counts describe the stated population in the maintained database counters or bounded sample checked on 27 October 2026. Source dates, geographic coverage and field availability vary. See the data methodology and API reference.