Skip to content
DatasetsBuilding permitsContractor licencesCertificates of occupancyBuilding inspectionsCode violations and complaintsDevelopment pipelineCoverage & freshnessDatasets overview
ProductsAPIWeb searchEnterprise exportsAlerts & webhooksProperty historyAI connector (MCP)
SolutionsInsuranceLenders & CREReal estateRoofingHVACSolarContractors
PricingDocs
ResourcesBlogCompareGlossaryMethodologyStatus
Sign inGet free API key
Arizona

Buckeye, Arizona Building Permit Search

Access 51,942 building permits on record in Buckeye, Arizona through a single REST API, normalized into a consistent schema. Data through November 20, 2026.

51,942
Total permits
6,635
Last 12 months
419
Last 30 days
-17%
Vs same period prior year
Nov 20, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types filed or issued in the last year.

New construction
3,005
Solar
809
Fire alarm
779
Electrical
454
Plumbing
434
Pool
230
HVAC
199
Signage
124
Interior remodel
117
Battery
73

Permit data by trade in Buckeye

Drill into the most common permit categories in Buckeye.

Top contractors in Buckeye

The most active contractors by permit volume in Buckeye, with a profile of each one's permit history. Counts are permits we hold for Buckeye.

Permits by ZIP code in Buckeye

Permit activity for individual ZIP codes in Buckeye, newest first by volume.

Property history for Buckeye

Search held permit records for a Buckeye address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent held permits filed or issued in Buckeye, Arizona, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.

DatePermit #AddressCategoryDescription
2026-11-20 (filed)BLDR-26-36176123 N 207TH LNNew constructionLot 18 Plan 8560 Elevation UA
2026-11-20 (filed)ELECR-26-094824117 W HADLEY STOtherINSTALLATION OF (2) TESLA POWERWALL 3 ENERGY STORAGE UNIT 13.5 KWH WITH REMOTE ENE...
2026-11-20 (filed)BLDC-26-043423601 W DURANGO STRenovationVERIZON PHO_HAMMOND - MODIFICATIONS TO EXISTING FACILITY TO ADD (1) NEW 2' MIC...
2026-11-20 (filed)FDPC-26-03791509 N VERRADO WAYFire alarmTHAI CHILI 2 GO AT VERRADO MARKETPLACE IN SUITE 106 - FIRE ALARM MODIFICATIONS OF ...
2026-11-20 (filed)ELECR-26-094724131 W HESS AVEOtherINSTALLATION OF (1) TESLA POWERWALL 3 ENERGY STORAGE UNIT 13.5 KWH AND A TESLA REM...
2026-11-20 (filed)ELECR-26-094524236 W RAYMOND STSolarInstallation of a Roof Mount 14.76 kW Solar System with Battery.
2026-11-20 (filed)BLDR-26-361823527 W ODEUM LNNew constructionLot 33 San Madera Encore BLDR-26-2021
2026-11-20 (filed)ELECR-26-094620663 W ROVEY AVEElectricalELECTRIC LINE FROM MAIN PANEL TO BACKYARD
2026-11-20 (filed)BLDR-26-361921589 W PIERSON STRoofing4K ALUMINUM FLAT ROOF 25'.583"X17'.5" W/ 11'.6"LX9'...
2026-11-19 (filed)BLDR-26-358630007 W GOLDEN POPPY AVENew constructionLOT 52 - NEW SINGLE FAMILY RESIDENCE PLAN 145.2578 A

Access Buckeye permit data via API

Query a page of held Buckeye, Arizona permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.

# Search Buckeye permits filed or issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Buckeye&state=AZ&date_after=2026-10-22"

Sources for Buckeye

The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal51,9422026-11-20

Other cities we cover

Related coverage in Arizona and nationwide.

FAQ

Where does PermitStack get Buckeye permit data?

We ingest Buckeye's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Buckeye data?

The newest permit we hold for Buckeye, Arizona is dated November 20, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Buckeye permits without an API key?

You need a free account, which needs no credit card. With it you can search Buckeye permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).

Can I export Buckeye permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.

How long does a Buckeye building permit take to issue?

The median time from permit filing to issuance in Buckeye, Arizona is 18 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.

Get Buckeye permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key