Access 791 building permits issued in Coalinga, California through a single REST API. Refreshed daily from the official Coalinga open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Coalinga, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-04 | MECC-2606-0007 | 300 W Elm | HVAC | HVAC Changeout |
| 2026-06-04 | SOLARR-2606-0264 | 240 Warthan St | Solar | PV roof mount 10 modules, 4.05kW, (1) ESS |
| 2026-06-04 | BLDR-2606-0267 | 247 MONROE | Addition | Inspection permit for sub-floor after flood repair. |
| 2026-06-04 | MECR-2606-0065 | 205 HOUSTON | HVAC | HVAC Changeout |
| 2026-06-04 | ENCR-2606-0038 | 512 SUNSET | Other | Install Residential Drive Approach |
| 2026-06-03 | BLDR-2606-0266 | 205 COALINGA | Addition | Reframe sliding glass door opening to fit french doors and hang door. |
| 2026-06-03 | SOLARR-2606-0263 | 580 S Princeton Ave | Solar | PV roof mount 17 modules, 6.885kW, (3) ESS |
| 2026-06-02 | MECR-2606-0064 | 141 WARTHAN | HVAC | HVAC changeout |
| 2026-06-02 | BLDR-2605-0260 | 395 COOLIDGE | Roofing | 3. Demolish and remove fire-damaged materials |
| 2026-06-01 | BLDR-2606-0265 | 147 COOLIDGE | Roofing | Tear-off and re-roof residence |
Query Coalinga, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Coalinga permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Coalinga&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Coalinga open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Coalinga, California was issued on June 5, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Coalinga permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Coalinga, California is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key