Access 90,599 building permits issued in Laguna Niguel, California through a single REST API. Refreshed daily from the official Laguna Niguel open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Laguna Niguel.
Most active contractors by permit volume in Laguna Niguel.
The 10 most recent permits issued in Laguna Niguel, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-02 | BR26-1570 | 8 Pearl | Plumbing | Remove old tank water heater and install new tank water heater emergency repair |
| 2026-08-02 | BR26-1569 | 24845 Laguna | Other | 176 SF FREESTANDING, ALUMINUM, CANTILEVERED PATIO COVER WITH 7'4" HIGH WALL |
| 2026-08-01 | BR26-1568 | 29111 Pompano | Electrical | Panel upgrade 100 to 200 amp |
| 2026-07-31 | PWE26-0206 | 25272 Spindlewood | Renovation | ATF LEAK REPAIR |
| 2026-07-31 | BR26-1564 | 23770 Hillhurst | Pool | Pool Replaster (no jacuzzi) |
| 2026-07-31 | BR26-1558 | 4 Newcastle | Electrical | PERMIT TO UPGRADE MAIN PANEL TO 200AMP UTILITY: SDG&E. PERMIT & JOB CARD R... |
| 2026-07-31 | PWE26-0208 | Park West - (ANNUAL PERMIT) Citywide on Public ROW | Other | Short Term Stationary for Temporary Traffic Control Inspections |
| 2026-07-31 | BR26-1560 | 24871 Crown Royale | Plumbing | PERMIT TO REMOVE AND REPLACE 50 GALLON WATER HEATER LIKE FOR LIKE. PERMIT & JO... |
| 2026-07-31 | BR26-1567 | 29821 White Otter | Roofing | Remove existing roof and replace with new roof, same material |
| 2026-07-31 | BR26-1563 | — | Renovation | Replacing 6 windows with no change to size or location. |
Query Laguna Niguel, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Laguna Niguel permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Laguna%20Niguel&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Laguna Niguel open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Laguna Niguel, California was issued on August 2, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Laguna Niguel permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Laguna Niguel, California is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key