Access 72,797 building permits issued in Laguna Niguel, California through a single REST API. Refreshed daily from the official Laguna Niguel open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Laguna Niguel.
The 10 most recent permits issued in Laguna Niguel, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-18 | BR26-1176 | 25561 Paseo La Vista | Plumbing | (Online Submittal). Permit for Pool area bathroom repipe. 3 toilets,urinal, 2 sink... |
| 2026-06-18 | BR26-1177 | 6 Cavalier | HVAC | (Online Submittal). Permit for Replacing HVAC system with 4 Zone HP ducted mini sp... |
| 2026-06-18 | BSA26-0049 | 34 Baroness | Solar | installation of roof mount solar panels with energy storage system |
| 2026-06-18 | PWE26-0183 | 27942 Forbes | Other | PODS Moving container parking on street at |
| 2026-06-18 | BR26-1178 | 30306 Benecia | Fence | CC26-0422: After the fact permit to |
| 2026-06-18 | PWE26-0182 | — | Demolition | I’m applying for an encroachment permit on behalf of National Data & Surveying... |
| 2026-06-18 | BSA26-0050 | 28581 Shrike | Roofing | Roof mounted PV with ESS |
| 2026-06-18 | BR26-1180 | 28113 Via Luis | HVAC | Like for like 2 ton HVAC change out. Coil Condenser and furnace - same location |
| 2026-06-18 | BR26-1179 | 28392 Las Cabos | Solar | Remove and Reinstall existing PV system |
| 2026-06-18 | BR26-1175 | 28 Westgate | Electrical | Just replace the main panel with a new main panel from 200 Amp to 200 Amp. Field V... |
Query Laguna Niguel, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Laguna Niguel permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Laguna%20Niguel&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Laguna Niguel open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Laguna Niguel, California was issued on June 18, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Laguna Niguel permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Laguna Niguel, California is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key