Access 23,690 building permits issued in San Carlos, California through a single REST API. Refreshed daily from the official San Carlos open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in San Carlos.
Most active contractors by permit volume in San Carlos.
The 10 most recent permits issued in San Carlos, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-07-21 | MEP2026-00429 | 83 HILLTOP | Plumbing | Trenchless sewer line replacement for upper lateral from cleanout located at found... |
| 2026-07-21 | MEP2026-00427 | 2369 HOWARD | Solar | 9 KW PV SYSTEM (20 MODS+INVERTER) & ESS+ BATTERY EXPANSION+ MSP UPGRADE |
| 2026-07-21 | BLDR2026-00515 | 111 WILSHIRE | Roofing | Reroof |
| 2026-07-21 | MEP2026-00428 | 1724 ELIZABETH | Electrical | Run wiring for 50 amp circuit to outbuilding |
| 2026-07-21 | MEP2026-00426 | 2369 HOWARD | Solar | 20 ELNSM54M-HC-N-450 solar modules |
| 2026-07-21 | BLDR2026-00514 | — | Addition | VOID NEEDS PLANNING APPROVAL New 579 Sq.Ft. Addition and Remodel per plans |
| 2026-07-21 | BLDR2026-00513 | 1300 HOWARD | HVAC | 1.Demolish and remove the entire existing one-story structure and associated site ... |
| 2026-07-21 | BLDR2026-00512 | — | Plumbing | VOID WRONG PERMIT TYPE water re-pipe (lateral/risers) |
| 2026-07-21 | BLDR2026-00511 | 2108 HOWARD | HVAC | 1. REMOVE EXISTING KITCHEN, CREATE NEW KITCHEN - LIKE FOR LIKE |
| 2026-07-20 | BLDR2026-00510 | 967 MC CUE | Interior remodel | kitchen remodel like for like, no structural changes |
Query San Carlos, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all San Carlos permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=San%20Carlos&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official San Carlos open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for San Carlos, California was issued on July 21, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter San Carlos permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in San Carlos, California is 2 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key