Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
California

San Jacinto, California Building Permit Search

Access 38,101 building permits issued in San Jacinto, California through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

38,101
Total permits
1,921
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Solar
577
New construction
282
Electrical
178
Fence
174
HVAC
141
Plumbing
134
Roofing
96
Interior remodel
79
EV charger
32
Addition
18

Permit data by trade in San Jacinto

Drill into the most common permit categories in San Jacinto.

Top contractors in San Jacinto

The most active contractors by permit volume in San Jacinto, with a profile of each one's permit history. Counts are permits we hold for San Jacinto.

Permits by ZIP code in San Jacinto

Permit activity for individual ZIP codes in San Jacinto, newest first by volume.

Property history for San Jacinto

Every permit we hold for one San Jacinto address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in San Jacinto, California. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-07ELEC26-014551345 RANDOLPH CIRElectricalUpgrading main service panel from 100AMP to 200AMP and adding a new 240V NEMA EV o...
2026-08-07ELEC26-014662060 WARWICK STElectricalUpgrading main service panel from 100AMP to 200AMP and adding a new 240V NEMA EV o...
2026-08-07SOLAR26-006281471 OLD BRIDGE RDSolarPV SOLAR ROOF MOUNT 3.69KW, (9) MODULES, (1) INVERTER, (1) ESS, (1) EXPANSION, EXI...
2026-08-07ELEC26-014682612 EMPENNAGE STSolarSMITHS LANDING, PH15, LOT 97, PLAN 2, ELEV A, 3.69KW, 9 MODULES, 9 MICROINVERTERS
2026-08-07ELEC26-014602645 CAMBER STSolarSMITHS LANDING, PH14, LOT 75, PLAN 4, ELEV A, 4.1KW, 10 MODULES, 10 MICROINVERTERS
2026-08-07BRES26-01558576 MIRACLE DRFence4ft white vinyl privacy fence
2026-08-07MECC26-004252772 AZALEA AVEHVACMODIFICATION OF EXISTING R8 DUCT SYSTEM WITH 10 SUPPLY DUCTS AND 1 RETURN DUCT
2026-08-07ELEC26-014711947 WORCHESTER CTElectricalUpgrading Main Service Panel from current to 200AMP and adding a new 240V NEMA EV ...
2026-08-07ELEC26-01448392 E EVANS STElectricalUpgrading main service panel from 100AMP to 200AMP and adding a new 240V NEMA EV O...
2026-08-07ELEC26-01447611 E SHAVER STElectrical200amps MPU including a 240V Outlet with nothing attached or connected to the outlet

Access San Jacinto permit data via API

Query San Jacinto, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search San Jacinto permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=San%20Jacinto&state=CA&issued_after=2026-09-06"

Sources for San Jacinto

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal38,1012026-08-07Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get San Jacinto permit data?

We ingest San Jacinto's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the San Jacinto data?

The newest permit we hold for San Jacinto, California is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access San Jacinto permits without an API key?

Yes — search San Jacinto permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export San Jacinto permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a San Jacinto building permit take to issue?

The median time from permit filing to issuance in San Jacinto, California is 4 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get San Jacinto permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key