Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
California

Santee, California Building Permit Search

Access 417 building permits issued in Santee, California through a single REST API, normalized into a consistent schema. Data through August 7, 2026.

417
Total permits
148
Last 12 months
0
Last 30 days
—
vs same period prior year
Aug 7, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Solar
131
Signage
16
Interior remodel
1

Permit data by trade in Santee

Drill into the most common permit categories in Santee.

Top contractors in Santee

The most active contractors by permit volume in Santee, with a profile of each one's permit history. Counts are permits we hold for Santee.

Permits by ZIP code in Santee

Permit activity for individual ZIP codes in Santee, newest first by volume.

Property history for Santee

Every permit we hold for one Santee address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Santee, California. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-08-07B-SolarAPP-26-00789540 ABBEYFIELD RDSolar11- Q.PEAK DUO BLK ML-G10.C+ 410 solar modules
2026-08-06B-SolarAPP-26-00799542 ABBEYFIELD RDSolar9-Q.PEAK DUO BLK ML-G10.C+ 410 solar modules
2026-08-05B-SolarAPP-26-007711114 SHADOW HILL WYSolarInstall Roof Mounted PV; 6.56kW with 16 modules. Install 1 Energy Storage System w...
2026-07-29B-SIGN-26-0011Corner of Aubrey Glen and Mission Gorge RoadSignageTownsend entry monument wall and sign for city plan check.
2026-07-24B-SolarAPP-26-00769031 GORGE AVSolarInstall 6.15kW roof-mounted PV with energy storage
2026-07-24B-SolarAPP-26-007511050 LARKRIDGE STSolarInstall 10.66kW roof-mounted PV with energy storage
2026-07-20B-SIGN-26-001010612 PROSPECT AVSignageInstalling three wall signs for Green Reserve cannabis retail store. 94.33 square ...
2026-07-18B-SolarAPP-26-00749209 ARNAZ WYSolarInstall Roof Mounted PV; 10.66kW with 26 modules. Install 1 Energy Storage System ...
2026-07-17B-SolarAPP-26-007210034 EL NOPALSolar11 Q.PEAK DUO BLK ML-G10.C+ 410 solar modules
2026-07-17B-SolarAPP-26-007310212 SWANTON DRSolar9-Q.PEAK DUO BLK ML-G10.C+ 410 solar modules

Access Santee permit data via API

Query Santee, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Santee permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Santee&state=CA&issued_after=2026-09-06"

Sources for Santee

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal4172026-08-07Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Other cities we cover

Related coverage in California and nationwide.

FAQ

Where does PermitStack get Santee permit data?

We ingest Santee's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Santee data?

The newest permit we hold for Santee, California is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (49d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.

Can I access Santee permits without an API key?

Yes — search Santee permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Santee permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Santee building permit take to issue?

The median time from permit filing to issuance in Santee, California is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Santee permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key