Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
Connecticut

Connecticut (Energy Storage Solutions), Connecticut Building Permit Search

Access 1,949 building permits issued in Connecticut (Energy Storage Solutions), Connecticut through a single REST API, normalized into a consistent schema. Data through September 30, 2026.

1,949
Total permits
883
Last 12 months
20
Last 30 days
—
vs same period prior year
Sep 30, 2026
Latest permit

Permit data by trade in Connecticut (Energy Storage Solutions)

Drill into the most common permit categories in Connecticut (Energy Storage Solutions).

Top contractors in Connecticut (Energy Storage Solutions)

The most active contractors by permit volume in Connecticut (Energy Storage Solutions), with a profile of each one's permit history. Counts are permits we hold for Connecticut (Energy Storage Solutions).

Property history for Connecticut (Energy Storage Solutions)

Every permit we hold for one Connecticut (Energy Storage Solutions) address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Connecticut (Energy Storage Solutions), Connecticut. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-09-30ESS-06073—SolarPaired with solar PV
2026-09-30ESS-06069—SolarPaired with solar PV
2026-09-30ESS-06072—SolarPaired with solar PV
2026-09-30ESS-05858—SolarPaired with solar PV
2026-09-30ESS-06066—SolarPaired with solar PV
2026-09-30ESS-06068—SolarPaired with solar PV
2026-09-30ESS-06067—SolarPaired with solar PV
2026-09-30ESS-06071—SolarPaired with solar PV
2026-09-29ESS-06059—SolarPaired with solar PV
2026-09-29ESS-06056—SolarPaired with solar PV

Access Connecticut (Energy Storage Solutions) permit data via API

Query Connecticut (Energy Storage Solutions), Connecticut permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Connecticut (Energy Storage Solutions) permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Connecticut%20%28Energy%20Storage%20Solutions%29&state=CT&issued_after=2026-09-23"

Sources for Connecticut (Energy Storage Solutions)

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
Energy Storage Solutionsopen data (Socrata)1,9492026-09-30

Other cities we cover

Related coverage in Connecticut and nationwide.

FAQ

Where does PermitStack get Connecticut (Energy Storage Solutions) permit data?

We ingest Connecticut (Energy Storage Solutions)'s official permit records directly from Tyler Data & Insights (Socrata) and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Connecticut (Energy Storage Solutions) data?

The newest permit we hold for Connecticut (Energy Storage Solutions), Connecticut is dated September 30, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Connecticut (Energy Storage Solutions) permits without an API key?

Yes — search Connecticut (Energy Storage Solutions) permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Connecticut (Energy Storage Solutions) permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Connecticut (Energy Storage Solutions) building permit take to issue?

The median time from permit filing to issuance in Connecticut (Energy Storage Solutions), Connecticut is 32 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Connecticut (Energy Storage Solutions) permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key