Access 17,719 building permits issued in Guilford, Connecticut through a single REST API. Refreshed daily from the official Guilford open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Guilford.
The 10 most recent permits issued in Guilford, Connecticut. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-18 | PZ-ZONPERM-2606-001727 | 832 PODUNK RD | HVAC | Replacement A/C condenser |
| 2026-06-18 | BLDR--2606-000661 | 278 COUNTY RD | Renovation | Remove decking and railing from existing deck, leaving framing. Replace decking an... |
| 2026-06-18 | PZ-ZONPERM-2606-001728 | 296 OLD WHITFIELD ST | Roofing | Replace exterior moldings and soffit matching original exactly as a result of a tr... |
| 2026-06-18 | BLDR--2606-000662 | 96 GLENWOOD DR | Interior remodel | Replace two basement hopper windows, and two double hung basement windows, in kind... |
| 2026-06-18 | PZ-ZONPERM-2606-001726 | 156 TULIP TREE DR | HVAC | Replace existing A/C system |
| 2026-06-18 | MECHANICAL-2606-000278 | 1439 WEST ST | Mechanical | Installation of a new three zone ductless system |
| 2026-06-18 | FOOD-2606-000339 | PARK ST | Other | I am a vendor at the Guilford Craft Show selling refrigerated pickled in 16oz. gla... |
| 2026-06-18 | PZ-ZONPERM-2606-001729 | 122 MEADOW HILLS DR | HVAC | remove and replace 275 gallon fuel oil tank |
| 2026-06-18 | ELECCOM--2606-000034 | 342 WATER ST | Electrical | Wiring for pool house with lighting and outlets |
| 2026-06-18 | BLDR--2606-000660 | 173 WHITFIELD ST | Interior remodel | Turning exsisting porch into a 3 seson porch, no heat. |
Query Guilford, Connecticut permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Guilford permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Guilford&state=CT&issued_after=2026-04-01"
Related coverage in Connecticut and nationwide.
We ingest data directly from the official Guilford open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Guilford, Connecticut was issued on June 18, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Guilford permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Guilford, Connecticut is 8 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key