Access 5,734 building permits issued in Flowery Branch, Georgia through a single REST API. Refreshed daily from the official Flowery Branch open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Flowery Branch.
The 10 most recent permits issued in Flowery Branch, Georgia. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-07-21 | BLDR-000321-2026 | 5264 Ivory Oak | New construction | New Single Family Residential Construction |
| 2026-07-21 | BLDR-000276-2026 | 5592 KESWICK | New construction | New single-family residence Mulberry Summit Lakewood C |
| 2026-07-21 | BLDR-000275-2026 | 5597 KESWICK | New construction | New single-family house construction at Mulberry Summit |
| 2026-07-21 | BLDR-000301-2026 | 5669 NEWBERRY POINT | Other | 14 x 36 foot storage building |
| 2026-07-21 | BLDR-000277-2026 | 5548 KESWICK | New construction | New single-family house construction at Mulberry Summit |
| 2026-07-21 | BLDR-000297-2026 | 5105 FRONTIER | New construction | EASLYN CROSSING LOT 28 - NEW SINGLE-FAMILY HOUSE |
| 2026-07-21 | BLDR-000285-2026 | 5498 ALLEGRO | New construction | New SFR - Lot 31 - Hampstead P |
| 2026-07-20 | ROW-000290-2026 | 5170 CHURCH | Other | Install by open trench methods (2) ~18' of 2" MHP gas mains in order to p... |
| 2026-07-16 | BLDR-000284-2026 | 5201 MULBERRY | New construction | New SFR - Griffin II B |
| 2026-07-16 | ROW-000287-2026 | 5702 NEWBERRY POINT | Addition | 40x15 Driveway addition to home |
Query Flowery Branch, Georgia permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Flowery Branch permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Flowery%20Branch&state=GA&issued_after=2026-04-01"
Related coverage in Georgia and nationwide.
We ingest data directly from the official Flowery Branch open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Flowery Branch, Georgia was issued on July 21, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Flowery Branch permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Flowery Branch, Georgia is 1 day, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key