Access 9,225 building permits on record in Perry, Georgia through a single REST API, normalized into a consistent schema. Data through August 7, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Perry.
The most active contractors by permit volume in Perry, with a profile of each one's permit history. Counts are permits we hold for Perry.
Permit activity for individual ZIP codes in Perry, newest first by volume.
Search held permit records for a Perry address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Perry, Georgia, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-07 (filed) | BLDR 260575 | 109 Antiquity | New construction | New Single Family |
| 2026-08-07 (filed) | BLDR 260574 | 106 Antiquity CIR | New construction | New Single Family |
| 2026-08-06 (filed) | BLDR 260573 | 107 Antiquity CIR | New construction | New Single Family |
| 2026-08-06 (filed) | SIGN 260572 | 254 Perry PKWY | Signage | Permanent Non Electrified |
| 2026-08-05 (filed) | BLDR 260562 | 122 Cloverdale DR | New construction | New Single Family |
| 2026-08-05 (filed) | BLDR 260561 | 124 Cloverdale DR | New construction | New Single Family |
| 2026-08-05 (filed) | BLDR 260560 | 126 Cloverdale DR | New construction | New Single Family |
| 2026-08-05 (filed) | BLDR 260567 | 223 Farmland CIR | New construction | New Single Family |
| 2026-08-05 (filed) | BLDR 260563 | 120 Cloverdale DR | New construction | New Single Family |
| 2026-08-05 (filed) | BLDR 260564 | 225 Farmland CIR | New construction | New Single Family |
Query a page of held Perry, Georgia permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Perry permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Perry&state=GA&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 9,225 | 2026-08-07 | Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in Georgia and nationwide.
We ingest Perry's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Perry, Georgia is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
You need a free account, which needs no credit card. With it you can search Perry permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median time from permit filing to issuance in Perry, Georgia is 12 days, based on permits issued in the last 12 months. This is an aggregate of held records with both dates, not a forecast for a new application. Timing can vary by project scope, review requirements and source coverage.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key