Access 30,016 building permits on record in Darlington County, South Carolina through a single REST API, normalized into a consistent schema. Data through August 9, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Darlington County.
The most active contractors by permit volume in Darlington County, with a profile of each one's permit history. Counts are permits we hold for Darlington County.
Search held permit records for a Darlington County address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Darlington County, South Carolina, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-09 (filed) | ELEC-08-26-35259 | 533 Icoe lane LN | Electrical | Service |
| 2026-08-07 (filed) | ELEC-08-26-35246 | 1946 East Park Drive | Electrical | Service |
| 2026-08-07 (filed) | RBLD-08-26-35248 | 901 ROGERS RD | Interior remodel | Alteration, Remodel, Repair, Replace |
| 2026-08-07 | ELEC-08-26-35254 | 1846 HOME AV | Electrical | Repair |
| 2026-08-07 | ELEC-08-26-35231 | 1717 UNA RD | Electrical | Repair |
| 2026-08-07 (filed) | ELEC-08-26-35242 | 1942 East Park Drive | Electrical | Service |
| 2026-08-07 (filed) | ELEC-08-26-35240 | 1938 East Park Drive | Electrical | Service |
| 2026-08-07 | GAS-08-26-35230 | 1336 QUAIL POINT RD | New construction | New Construction |
| 2026-08-07 | RBLD-08-26-35252 | 1391 Pocket RD | New construction | New Construction |
| 2026-08-07 (filed) | ELEC-08-26-35237 | 1934 East Park Drive | Electrical | Service |
Query a page of held Darlington County, South Carolina permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Darlington County permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Darlington%20County&state=SC&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 30,016 | 2026-08-09 | Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in South Carolina and nationwide.
We ingest Darlington County's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Darlington County, South Carolina is dated August 9, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
You need a free account, which needs no credit card. With it you can search Darlington County permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median filing-to-issue date gap in the qualifying held Darlington County records rounds to 0 days. This includes permits issued in the last 12 months with both dates and nonnegative gaps of at most 365 days. Date fields do not establish the submission method or processing speed, and this aggregate is not a forecast for a new application.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key