Access 49,615 building permits issued in Leander, Texas through a single REST API. Refreshed daily from the official Leander open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Leander.
The 10 most recent permits issued in Leander, Texas. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-20 | FIREANNL-26-00108 | 1841 CRYSTAL FALLS PKWY | Other | Legacy at Crystal Falls is an Assisted Living and Memory Care community. 70 Units. |
| 2026-06-19 | BLDR-26-11581 | 4417 STONE HOUSE RANCH BND | New construction | New construction single family residential home |
| 2026-06-19 | MECH-26-00807 | 2209 PIEDMONT CT | HVAC | Replacement of HVAC system. |
| 2026-06-19 | BLDR-26-11576 | 2472 DESCENDANT DR | New construction | Single family residential home construction |
| 2026-06-19 | MECH-26-00805 | 1103 SORREL CT | HVAC | Replacement of HVAC system. |
| 2026-06-19 | ELEC-26-00812 | 1806 IRELAND DR | Electrical | Install outlet in cabinet above vent hood, on exsiting wiring, vent hood was remov... |
| 2026-06-19 | BLDR-26-11584 | 1421 MAGNOLIA FARM WAY | New construction | New construction single family residential home |
| 2026-06-19 | BLDR-26-11579 | 4413 RAMBLIN ACRES RD | New construction | New construction single family residential home |
| 2026-06-19 | MECH-26-00806 | 1508 CANDLELIGHT DR | HVAC | 5 TON HVAC REPLACEMENT |
| 2026-06-19 | BLDR-26-11580 | 4412 STONE HOUSE RANCH BND | New construction | New construction single family residential home |
Query Leander, Texas permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Leander permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Leander&state=TX&issued_after=2026-04-01"
Related coverage in Texas and nationwide.
We ingest data directly from the official Leander open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Leander, Texas was issued on June 20, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Leander permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Leander, Texas is 9 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key