Access 10,983 building permits issued in Fairfield, California through a single REST API. Refreshed daily from the official Fairfield open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Fairfield, California. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-08 | BLDR26-01162 | 2175 MONTEREY | HVAC | Replacing the furnace and AC. Like for Like |
| 2026-06-08 | BLDR26-01157 | 3502 VALLEY VIEW | Mechanical | Replacing 5 ton condenser and 5 ton evaporator coil. |
| 2026-06-08 | BLDR26-01175 | 4942 SILVERADO | Solar | Re Roof, Tear off install cool roof composition, No Solar panels |
| 2026-06-08 | BLDR26-01163 | 2321 CHINA | Roofing | Remove and install 21 squares of composition shingles. Dry rot repairs. Siding rep... |
| 2026-06-08 | SAPP26-00273 | 2788 SHEARWATER | Solar | 11.5w AC (7) Panel Roofmount PV System w/ (2) ESS |
| 2026-06-08 | BLDR26-01158 | 731 SEQUOIA | Roofing | Reroof 26 sqs of comp shingles, like for like |
| 2026-06-08 | BLDR26-01129 | 1731 KEARNY | Mechanical | REPLACING CONDENSER AND COIL WITH LIKE FOR LIKE. |
| 2026-06-08 | SAPP26-00272 | 1637 VICKSBURG | Solar | 11.5w AC (17) Panel Roofmount PV System w/ (2) ESS |
| 2026-06-08 | BLDR26-01119 | 5164 LAKESHORE | Renovation | Replace (7) Retrofit Windows. Same Size, Same Locations. |
| 2026-06-08 | BLDR26-01142 | 790 LARGO | Renovation | Replace (4) Retrofit Windows. Same Size, Same Locations. |
Query Fairfield, California permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Fairfield permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Fairfield&state=CA&issued_after=2026-04-01"
Related coverage in California and nationwide.
We ingest data directly from the official Fairfield open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Fairfield, California was issued on June 8, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Fairfield permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Fairfield, California is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key