Access 1,975 building permits issued in Bow, New Hampshire through a single REST API. Refreshed daily from the official Bow open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Bow.
The 10 most recent permits issued in Bow, New Hampshire. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-12 | E-0456-26 | 33 HAMPSHIRE HILLS DRIVE | Electrical | Electrical Replace Wiring/Devices Tim and Ginger Fraser |
| 2026-08-12 | E-0454-26 | 3 FIELDSTONE DRIVE | Solar | Solar New Panel - Roof Mount Ryan Audley |
| 2026-08-12 | M-0455-26 | 33 HAMPSHIRE HILLS DRIVE | HVAC | Mechanical Replace A/C or Mini-Split Tim and Ginger Fraser |
| 2026-08-12 | SS-0453-26 | 652 RIVER ROAD | Plumbing | Septic Systems Replacement Commercial Coastal Forestry Products |
| 2026-08-11 | B-0449-26 | 21 MERRILL CROSSING | Pool | Pools Residential Above Ground Pool Above Ground Pool |
| 2026-08-11 | M-0450-26 | 2 CHELSEA DRIVE | Mechanical | Mechanical New Propane Tank/Piping Kyle Fillion |
| 2026-08-11 | E-0451-26 | 20 SOUTH BOW DUNBARTON ROAD | Electrical | Electrical Replace Service Tom O'Donovan |
| 2026-08-11 | E-0452-26 | 36 WESTOVER LANE | Electrical | Electrical New Wiring/Devices 36 Westover |
| 2026-08-11 | B-0447-26 | 32 PUTNEY ROAD | Renovation | Residential building Repair Single-family dwelling Abbott Putney Road |
| 2026-08-11 | M-0446-26 | 15 STACK DRIVE | Mechanical | Mechanical Replace Boiler 15 stack dr |
Query Bow, New Hampshire permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Bow permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Bow&state=NH&issued_after=2026-04-01"
Related coverage in New Hampshire and nationwide.
We ingest data directly from the official Bow open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Bow, New Hampshire was issued on August 12, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Bow permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Bow, New Hampshire is 3 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key