Skip to content
Products API & Data Search Coverage Property History Alerts For Contractors Data Exports
Solutions Solar & Energy Roofing HVAC Real Estate Insurance Lenders & CRE Contractors
Pricing Refer & Earn API Docs Sign In Get Started
New Hampshire

Concord, New Hampshire Building Permit Search

Access 102,101 building permits issued in Concord, New Hampshire through a single REST API, normalized into a consistent schema. Data through September 15, 2026.

102,101
Total permits
3,370
Last 12 months
148
Last 30 days
—
vs same period prior year
Sep 15, 2026
Latest permit

Permits by category (last 12 months)

Most common permit types issued in the last year.

Plumbing
882
Mechanical
725
Electrical
634
Signage
282
New construction
159
Fire alarm
128
Interior remodel
83
Renovation
64
Demolition
57
Solar
53

Permit data by trade in Concord

Drill into the most common permit categories in Concord.

Property history for Concord

Every permit we hold for one Concord address (roof, HVAC, solar, additions, with dates and contractors) in a single call to /v1/property/history. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.

Most recent permits

The 10 most recent permits issued in Concord, New Hampshire. Full dataset available via REST API.

IssuedPermit #AddressCategoryDescription
2026-09-15BP-1847-202626 Thayer Pond RdAdditionReplace existing 8 ft 6 inch deep x 16 ft long deck with a 10 ft deep x 16 ft long...
2026-09-15MP-2983-20266 Storrs StMechanicalInstallation of two RTU's
2026-09-15BPG-0127-20264 Thomas StNew construction40x30 garage/workshop with two garage bays and a second-floor storage area. Buildi...
2026-09-15MP-2985-202614 Chase StMechanicalBoiler swap
2026-09-15MP-2974-202685 S State StMechanicalMini split install
2026-09-15FD-LP/HM-2026-0359140 Peaceful LnPlumbingDELIVER AND SET 2-120 ASME TANKS RUNNING 6 FT OF 5/8 COPPER
2026-09-15BPG-0131-202611 Fellows StNew constructionNeed to insulate my 528 sqft garage ceiling with R-23 Comfortbatt and walls with R...
2026-09-15EP-3250-202635 Shaker RdElectrical- 6 new LED puck lights in living room with new wiring for lights and for a new 3-...
2026-09-15BP-1840-2026Great Falls Dr 54-68Interior remodelKitchen remodel, remove one non load bearing wall, new cabinets and countertops.
2026-09-15EP-3248-202685 Manchester St Building 1Electrical85 Manchester, Building 1, Unit 6- Hair Salon electrical.

Access Concord permit data via API

Query Concord, New Hampshire permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.

# Search Concord permits issued in the last 30 days
curl -H "X-API-Key: YOUR_KEY" \
  "https://api.permit-stack.com/v1/permits/search?city=Concord&state=NH&issued_after=2026-09-06"

Sources for Concord

The official record sets behind this page, with the date each one's data runs through.

Record setSourcePermitsData throughNote
PermitsEnerGov permit portal102,1012026-09-15

Other cities we cover

Related coverage in New Hampshire and nationwide.

FAQ

Where does PermitStack get Concord permit data?

We ingest Concord's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.

How current is the Concord data?

The newest permit we hold for Concord, New Hampshire is dated September 15, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Some cities publish permits days after they are filed.

Can I access Concord permits without an API key?

Yes — search Concord permits free in the browser, no signup needed. The API needs a free key (100 requests per day, no credit card).

Can I export Concord permit data?

Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) push new permits after each nightly ingest.

How long does a Concord building permit take to issue?

The median time from permit filing to issuance in Concord, New Hampshire is 5 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.

Get Concord permit data in your app today

Free tier covers 100 requests per day. No credit card required.

Get Free API Key