Access 13,566 building permits issued in Dover (NH), New Hampshire through a single REST API. Refreshed daily from the official Dover (NH) open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
The 10 most recent permits issued in Dover (NH), New Hampshire. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-06-08 | MECH-2026-0318 | 71 CROWN POINT DR | Plumbing | Replace 40 gallon natural gas power vent water heater. |
| 2026-06-08 | ELEC-2026-0248 | 0 Fawn dr | Electrical | 200A Overhead temp service |
| 2026-06-08 | PLMB-2026-0347 | 19 WOODLAND RD | Plumbing | Primary Bath: |
| 2026-06-08 | BLDM-2026-0279 | 4 CHEROKEE ST | Addition | Siding- No structural Changes |
| 2026-06-08 | PLMB-2026-0349 | 421 CENTRAL AV | Plumbing | Plumbing renovation, setting new fixtures in the bathrooms, hand wash sink and pre... |
| 2026-06-08 | ELEC-2026-0269 | 520 SIXTH ST | Electrical | install 100 amp meter main disconnect single phase 120/240 volt |
| 2026-06-08 | SITW-2026-0062 | 3 DOVER ST | Other | Excavate and remove damaged asphalt on 3 Dover add gravel as needed and then apply... |
| 2026-06-08 | SITW-2026-0082 | 240 DOVER POINT RD | Other | RE-PAVING EXISTING DRIVEWAY |
| 2026-06-08 | MECH-2026-0326 | 789 CENTRAL AV | Plumbing | New gas line from existing meter to existing rooftop units |
| 2026-06-08 | MECH-2026-0323 | 11 GLENCREST AV | HVAC | - Supply and install MXZ- SM48,000 BTU Hyper heat condenser. |
Query Dover (NH), New Hampshire permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Dover (NH) permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Dover%20(NH)&state=NH&issued_after=2026-04-01"
Related coverage in New Hampshire and nationwide.
We ingest data directly from the official Dover (NH) open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Dover (NH), New Hampshire was issued on June 8, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Dover (NH) permits interactively. Sign up for a free API key to get started.
Yes. Paid plans support CSV export and periodic webhooks for changed permits.
The median time from permit filing to issuance in Dover (NH), New Hampshire is 7 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key