Access 13,142 building permits issued in Dover (NH), New Hampshire through a single REST API. Refreshed daily from the official Dover (NH) open data portal and normalized into a consistent schema.
Most common permit types issued in the last year.
Drill into the most common permit categories in Dover (NH).
Most active contractors by permit volume in Dover (NH).
The 10 most recent permits issued in Dover (NH), New Hampshire. Full dataset available via REST API.
| Issued | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-09-06 | BLDM-2026-0518 | 130 GULF RD | Addition | Purchasing an 18x12 shed for the property |
| 2026-09-05 | BLDM-2026-0517 | 67 PARK ST | Demolition | Garage demolition |
| 2026-09-04 | SIGN-2026-0040 | 7 BROADWAY | Signage | Remove existing wall mounted building sign and replacing with new wall mounted bui... |
| 2026-09-04 | COND-2026-0038 | 7 FIELDSTONE DR | Plumbing | Proposed project is to build an ADU in previously disturbed area within the wetlan... |
| 2026-09-04 | MECH-2026-0555 | 8 FAWN DR | HVAC | Ductwork, furnace, coil, condenser, flue and lineset |
| 2026-09-04 | BLDM-2026-0516 | 38 FIFTH ST | Addition | Remove and replace 1 window, same size, no structural change. |
| 2026-09-04 | BLDM-2026-0515 | 47 CHESTNUT ST | Demolition | Demo existing building |
| 2026-09-04 | MECH-2026-0556 | 8 FAWN DR | HVAC | Ductwork, furnace, coil, condenser, flue and lineset |
| 2026-09-03 | MECH-2026-0554 | 1 CHEROKEE ST | Mechanical | INSTALLATION OF 2-120 LPG TANKS WITH CONNECTION TO STUB INSTALLED BY OTHERS. |
| 2026-09-03 | BLDG-2026-0120 | 25 DOVER POINT RD | Addition | Removal of Existing House |
Query Dover (NH), New Hampshire permits with a single HTTP request. Returns JSON with address, category, status, dates, and full description.
# Search all Dover (NH) permits issued this month curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Dover%20(NH)&state=NH&issued_after=2026-04-01"
Related coverage in New Hampshire and nationwide.
We ingest data directly from the official Dover (NH) open data portal (the official city portal) daily. This is the same source used by the city's own public dashboards, normalized into a consistent JSON schema across our U.S. jurisdictions.
Our automated ingestion runs daily at 03:00 UTC. The latest permit in our database for Dover (NH), New Hampshire was issued on September 6, 2026. Permit backlogs on the city side may mean some permits take a few days to appear.
Yes — our free tier includes 100 requests per day, enough to search and filter Dover (NH) permits interactively. Sign up for a free API key to get started.
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Real-time webhooks for changed permits are on the Developer plan and above.
The median time from permit filing to issuance in Dover (NH), New Hampshire is 6 days, based on permits issued in the last 12 months. Smaller permit types (residential alteration, electrical) typically issue faster; new construction and large additions usually take longer.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key