Access 3,784 building permits on record in Meredith, New Hampshire through a single REST API, normalized into a consistent schema. Data through August 7, 2026.
Most common permit types filed or issued in the last year.
Drill into the most common permit categories in Meredith.
The most active contractors by permit volume in Meredith, with a profile of each one's permit history. Counts are permits we hold for Meredith.
Permit activity for individual ZIP codes in Meredith, newest first by volume.
Search held permit records for a Meredith address through /v1/property/history, subject to source coverage, address matching, pagination and plan history limits. Dates and contractor fields may be missing; permit-date signals do not establish installation or current condition. Used by lenders for collateral review, insurers for roof and system age, and real estate teams for due diligence.
The 10 most recent held permits filed or issued in Meredith, New Hampshire, by issue date where the source publishes one and filing date otherwise. Search held records via the REST API within plan and pagination limits.
| Date | Permit # | Address | Category | Description |
|---|---|---|---|---|
| 2026-08-07 (filed) | SP2-080726-0012 | 194 DANIEL WEBSTER HWY | Other | Cousins Maine Lobster Truck at Twin Barns - outside of their approval. |
| 2026-08-07 (filed) | BLDR-080726-0326 | 1 PENNY IS | Renovation | Replace existing dock. |
| 2026-08-07 | BLDR-080626-0325 | 20 True Road Unit 078 | Roofing | Adding a metal roof over part of the existing deck. Using 4"x4"x8' w... |
| 2026-08-06 | DEMO-2026-08-05-0053 | 1 Fish Cove Rd | Demolition | Tearing down existing structure and deck. |
| 2026-08-06 | PLMR-080626-0141 | 49 EATON AVE | HVAC | Derk did HVAC - New furnace and Central Air Install |
| 2026-08-06 | ELER-080526-0260 | 44 stonedam Island Road | Electrical | Service for a garage with 600 AMP |
| 2026-08-06 | SIGN-080426-0019 | 416 DANIEL WEBSTER HWY | Signage | Sign on the building 54SF |
| 2026-08-06 | BLDR-080426-0322 | 26 Hatch Corner | Fence | Install fence on lot line 200 feet. (South property line) Modern fence, vinyl 6ft ... |
| 2026-08-06 | PLMR-080626-0140 | 16 SACHEM COVE RD | HVAC | Add 1 full bathroom for garage. Lic# 4313 |
| 2026-08-05 (filed) | BLDR-080526-0323 | 95 OLD CENTER HARBOR RD | Interior remodel | REMOVE AND REPLACE 9 WINDOWS; LIKE FOR LIKE SIZE; NO STRUCTURAL CHANGES |
Query a page of held Meredith, New Hampshire permit records. Address, category, status, dates and description depend on the source and may be missing or unknown.
# Search Meredith permits filed or issued in the last 30 days curl -H "X-API-Key: YOUR_KEY" \ "https://api.permit-stack.com/v1/permits/search?city=Meredith&state=NH&date_after=2026-10-22"
The official record sets behind this page, with data-through dates where measured; missing dates remain unknown.
| Record set | Source | Permits | Data through | Note |
|---|---|---|---|---|
| Permits | EnerGov permit portal | 3,784 | 2026-08-07 | Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped. |
Related coverage in New Hampshire and nationwide.
We ingest Meredith's official permit records directly from the jurisdiction's own permit portal and normalize them into a consistent JSON schema across our U.S. jurisdictions.
The newest permit we hold for Meredith, New Hampshire is dated August 7, 2026. We re-read this source on a nightly schedule and publish the date the data runs through rather than the date we last polled. Upstream access blocked since 2026-08-18 (95d) — the host refuses our requests (HTTP 403); we cannot confirm whether the source itself has stopped.
You need a free account, which needs no credit card. With it you can search Meredith permits in the browser or call the API (100 requests per day; the free plan covers the last 30 days of permits).
Yes. CSV export is available on every plan, including free, with the row cap rising by tier. Webhooks (Developer plan and up) attempt delivery of eligible matching records after ingestion. Source delays, matching windows, backlog, retries and endpoint availability affect arrival.
The median filing-to-issue date gap in the qualifying held Meredith records rounds to 0 days. This includes permits issued in the last 12 months with both dates and nonnegative gaps of at most 365 days. Date fields do not establish the submission method or processing speed, and this aggregate is not a forecast for a new application.
Free tier covers 100 requests per day. No credit card required.
Get Free API Key